{"id":1955,"date":"2023-04-25T20:06:20","date_gmt":"2023-04-26T02:06:20","guid":{"rendered":"https:\/\/puertoaltamira.com.mx\/engi\/?p=1955"},"modified":"2023-04-25T20:06:20","modified_gmt":"2023-04-26T02:06:20","slug":"api-visits-terminal-to-supervise-operations","status":"publish","type":"post","link":"https:\/\/puertoaltamira.com.mx\/engi\/api-visits-terminal-to-supervise-operations\/","title":{"rendered":"API visits terminal to supervise operations"},"content":{"rendered":"<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-1956 size-full\" src=\"https:\/\/puertoaltamira.com.mx\/engi\/wp-content\/uploads\/2023\/04\/RECORRIDO-ATP-PAGINA.jpg\" alt=\"\" width=\"657\" height=\"320\" srcset=\"https:\/\/puertoaltamira.com.mx\/engi\/wp-content\/uploads\/2023\/04\/RECORRIDO-ATP-PAGINA.jpg 657w, https:\/\/puertoaltamira.com.mx\/engi\/wp-content\/uploads\/2023\/04\/RECORRIDO-ATP-PAGINA-300x146.jpg 300w, https:\/\/puertoaltamira.com.mx\/engi\/wp-content\/uploads\/2023\/04\/RECORRIDO-ATP-PAGINA-260x127.jpg 260w, https:\/\/puertoaltamira.com.mx\/engi\/wp-content\/uploads\/2023\/04\/RECORRIDO-ATP-PAGINA-50x24.jpg 50w, https:\/\/puertoaltamira.com.mx\/engi\/wp-content\/uploads\/2023\/04\/RECORRIDO-ATP-PAGINA-150x73.jpg 150w\" sizes=\"(max-width: 657px) 100vw, 657px\" \/><\/p>\n<h5 align=\"justify\">The Manager of API Altamira; Mr. Rodriguez Montemayor, realized a tour in one of the specialized loading and unloading of containerized cargo terminal; Altamira Terminal Portuaria (ATP), in order to supervise the work and operations carried out.<\/h5>\n<h5 align=\"justify\">ATP is a public multi-use terminal which began operations in 1995 and today operates nearly 19% of total cargo in the Port. It also has 2 springs 300 meters each and has a draft of 40 feet (12.19 meters deep), which allows the arrival of large vessels.<\/h5>\n<h5 align=\"justify\">In other hand with the port equipment, ATP recently added 2 new ones; &#8220;Side Loader&#8221; Sany equipment, same that will be useful in terms of optimizing space within their yards working, allowing streamline port operations.<\/h5>\n<h5 align=\"justify\">At the end of the tour, the Manager of API, said that the acquisition of new equipment has a positive influence to maintain and improve the service to their clients, helping in the environment preservation by reducing fuel consumption and emissions air, putting the Port of Altamira as a highly profitable option to invest.<\/h5>\n<h5><\/h5>\n<h5><em>Port of Altamira.<\/em><\/h5>\n<h5><\/h5>\n<h5><\/h5>\n<h5><em>April 14th.<\/em><\/h5>\n<div class=\"top-buffer\">\n<h6><strong>Last updated on: 09\/06\/2014 (13:38)<\/strong><\/h6>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Manager of API Altamira; Mr. Rodriguez Montemayor, realized a tour in one of the specialized loading and unloading of containerized cargo terminal; Altamira Terminal Portuaria<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/puertoaltamira.com.mx\/engi\/wp-json\/wp\/v2\/posts\/1955"}],"collection":[{"href":"https:\/\/puertoaltamira.com.mx\/engi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/puertoaltamira.com.mx\/engi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/puertoaltamira.com.mx\/engi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/puertoaltamira.com.mx\/engi\/wp-json\/wp\/v2\/comments?post=1955"}],"version-history":[{"count":1,"href":"https:\/\/puertoaltamira.com.mx\/engi\/wp-json\/wp\/v2\/posts\/1955\/revisions"}],"predecessor-version":[{"id":1957,"href":"https:\/\/puertoaltamira.com.mx\/engi\/wp-json\/wp\/v2\/posts\/1955\/revisions\/1957"}],"wp:attachment":[{"href":"https:\/\/puertoaltamira.com.mx\/engi\/wp-json\/wp\/v2\/media?parent=1955"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/puertoaltamira.com.mx\/engi\/wp-json\/wp\/v2\/categories?post=1955"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/puertoaltamira.com.mx\/engi\/wp-json\/wp\/v2\/tags?post=1955"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}